A Data Center looking to extend connectivity across its massive campus had underground duct spaces that were severely overpopulated with smaller count cables. These spatial limitations impacted future deployment plans as there was nowhere for the prospective high-capacity fiber lines to go. A reconstruction solution would be labor intensive and require substantial retooling of the underground fiber spaces.
In this case study, discover how National Technologies (NTI), a Network Connex company, was able to tap into its extensive experience to propose a re-imagined solution that allowed the Data Center to utilize its existing duct system, stay ahead of its deadline and under budget, and enable future deployment.
Please Fill Out The Form TO DOWNLOAD
"*" indicates required fields